PROJECT 5
Battery Energy Storage System (Bess) Projects — Middle River Portfolio Samples
Representative projects:
Middle River – Hanford BESS (GIGA Hybrid) — 131.4 MW
Middle River – Henrietta BESS Hybrid — 99.4 MW
Middle River – Malaga Hybrid Combined Cycle + BESS (Hybrid integration)
Services provided:
Developed preliminary site and equipment layouts, including access, fire lanes, and maintenance/service clearances
Coordinated land and site due diligence: ALTA survey, geotechnical investigation, grading/drainage concepts, and stormwater/drainage planning
Provided high-voltage interconnection engineering support, including single-line diagrams (SLDs) and interconnection application support
Supported battery technology evaluation, battery selection, and interconnection strategy, including support for the reclamation/closeout process